This is a photograph page of What Happened Yesterday at Balleny Green In August 2009.
| 2nd Aug 09 | 2 1/2" Rally | 9 Aug 2009 | Tue 25 Aug 2009 |
|
|
If you click on any of the lines == you will come back to the top of this page
Not a lot has been going on at the grounds work wise. He we have a signal lever been installed down by the carriage sidings
![]()
========================================================================
The few lads have been very busy in the heat of the day digging to put the tube in for signal cables. Plus there was a couple of loco running 1 is a new member with a 5 inch gauge Polly. The lads on Thursday evening have been busy on the high level track. The new grass looks very good as well.
![]()
![]()
![]()
![]()
![]()
![]()
====================================================================================================
The top 2 photographs where taken on the 2nd August Dave and Peter sorting the start of the next bit. Signal ducting around the new track bed. Then I found that a new job had started on the raise track.


====================================================================================================
On the 2 August we had the annual 2 & 1/2" gauge rally at our club I have done a full web page with big photographs with video of cause.


I was asked to take a picture of here best side.






====================================================================================================