 |
This is were we started to dig out from. You can just see the pile of track
panels on the left side. The rail was rolled to the curve of the track then
bolted down with the clips to sleepers. |
 |
This photo was taken of the top of the tunnel |
 |
Chris our club treasurer doing his bit |
 |
Garry and Steve 2 fitting some fish plates at a joint. |
 |
Steve 2 on the first test run. |